| Issue 38, November 2011 |
 |
|
| EXPERIENCE OF APPLYING CT UNIT МK30T |
 |
The necessity in bringing down the production cost of the recovered oil and full
development of all its fields made the production association Belorusneft undertake
a number of researches and developments in the field of new technologies providing
for a longer period of high performance. It launched CT technologies in mid 2007,
when CT unit МК30Т produced by Fidmash emerged. In its initial variant МК30Т has
an injector (pipe handling mechanism) with the bearing force of up to 36 tons
and a coiled tube with the diameter of 44mm (working length is 3,500 m). Little
readjustment enabled MK30T to work with coiled tubes (СT) of 38 and 50 mm. The
unit can be applied in repair-and-renewal operations in deep wells of all types
(vertical, horizontal and directional wells), geophysical studies, enhanced recovery,
drilling slim-hole, sidetracks in the existing wells, deepening and reopening
of old wells, including underbalanced drilling.
Subscribe now to read the full text of the article. full text of the article | all articles of this issue
|