| Issue 38, November 2011 |
 |
|
| THE USE OF COILED TUBING UNITS AT BASHNEFT |
 |
Every year resources extraction at Bashkortostan fields becomes more challenging
due to oil fields depletion, formation pressure decrease and watering of produced
output. These pressing factors make active development of new technologies system
capable of increasing production volumes a vital issue. Analysis of the existing
oil production level, based on the data of recent years, revealed main directions
of new technologies introduction. These technologies are meant for maintaining
wells in operating conditions. The first decision is to gradually improve the
existing conventional technologies. The second option is to revise and replace
some technological solutions with new ones. This prompted the introduction of
innovative flow and intake well capacity stimulation technologies without well
workover teams, but instead with the help of coiled tubing units.
full text of the article | all articles of this issue
|