/
Journal
 
Archive
Editorial Board
Subscription
Authors’ Guidelines

Issue 38, November 2011
 
Issue 38, November 2011

THE USE OF COILED TUBING UNITS AT BASHNEFT

Every year resources extraction at Bashkortostan fields becomes more challenging due to oil fields depletion, formation pressure decrease and watering of produced output. These pressing factors make active development of new technologies system capable of increasing production volumes a vital issue. Analysis of the existing oil production level, based on the data of recent years, revealed main directions of new technologies introduction. These technologies are meant for maintaining wells in operating conditions. The first decision is to gradually improve the existing conventional technologies. The second option is to revise and replace some technological solutions with new ones. This prompted the introduction of innovative flow and intake well capacity stimulation technologies without well workover teams, but instead with the help of coiled tubing units.
 

full text of the article | all articles of this issue

Home News Technologies Journal Forum Conference Advertisement Contacts