| Issue 39, March 2012 |
 |
|
| Issue 37, September 2011 |
 |
 |
Key to Success of Innovation Projects Interview with L. Hruzdzilovich, Chairman of the Board of FID Group, author of Coiled Tubing Times Project more |
 |
Experience of CT Drilling of Multilaterial Wells on the Fields of RUE "Production Association Belorusneft" N.A. DEMIANENKO, Yu.A. BUTOV, A.N. BOGATKO, P.V. REVIAKOV, RUE “Production Association “Belorusneft”
S.A. ATRUSHKEVICH, N.N. KLUBNIKOV, A.G. SALOV, CJSC “Novinka” (FID Group) more |
 |
Will Russian O&G Service Be Integrated? V.V. Laptev , Vice President of the EurAsian Geophysical Society more |
 |
World’s First Production Logging with Fiber Optic Enabled Coiled Tubing (CT) Vidal NOYA, Abdur Rahman ADIL, Kellen WOLF, Soon Seong CHEE, John STUKER, Fernando RODRIGUEZ, SPE, Schlumberger more |
 |
ISOJET Technology of Sand Jet Perforation of the Production String With the Use of Coiled Tubing Followed by Hydraulic Fracturing Stanislav ZAGRANICHNY, Yevgeniy KAZAKOV, Alexander KAZAKOV, Trican Well Service Ltd more |
 |
Coiled Tube Is Able to Transmit Highly-Viscous Plugging Fluid and Magnetic Substances for Water Shutoff in Oil Wells (based on work experience at oil and gas fields of Turkmenistan)
I.B. BURKINSKY, Ph.D. in Economics, Master of Oil and Gas Production, Yu.A. BALAKIROV, Doctor of Engineering, Academician,
Professor, V.N. BROVCHUK, Mining Engineer for Oil and Gas Production, Ya.M. BOYKO, Mining Engineer for Oil and Gas Production,
Yug-Neftegaz more |
 |
Issues of Sand Production Prevention and Removal of Sand Plugs in the Watering Îut Gas Wells M.V. LISTAK, Tyumen State Oil and Gas University more |
 |
Price and Quality The representatives of the oil and gas producing companies are participating in the round table discussion: D.A. Molodan, Deputy Chief of Well Construction and Well Workover Directorate (Gazprom Dobycha Krasnodar), A.N. Rzaliyev, Workover Engineer (Zhaikmunai), P.I. Litvinenko, Senior Well Servicing and Workover Technology Manager
(Orenburgneft) more |
 |
BHA Availability is the Main Condition for CTD Joel Park, Coiled Tubing Drilling Technical Sales, NOV is answering the questions more |
 |
We Use Only Premium Class Packer/Anchor Equipment A.M. OVSYANKIN, General Director, Packer Service more |
 |
Protection of Îil Field Equipment by Scale Inhibitors Manufactured by FLEK A.V. DENISOVA, Doctor of Chemistry, Senior Engineer, Technical Department, FLEK more |
 |
The Quality of Propping Materials Determines the Profitability of Hydraulic Fracturing Yu.A. Balakirov, Doctor of Engineering, Deputy Director for Science and Technology of the International Company
Yug-Neftegaz Private Limited more |
 |
Coal Bed Methane Victoria GREK, Ivan SIDOROV, Coiled Tubing Times more |
 |
Modernization Is a Trend 11th Moscow International Oil and Gas Exhibition 2011/MIOGE 2011 more |
 |
Oilfield Chemistry – 2011 6th All-Russian Research and Practice Conference in the I.M. Gubkin Russian State University of Oil and Gas more |
 |
New Equipment and Technologies for Geophysical Well Logging 17th Scientific and Practical Conference in Ufa more |
 |
Oil & Gas Crude Refining and Petrochemistry of the Caspian Sea 18th International Conference in Baku more |
 |
Coiled Tubing Technologies in Ukraine Sergey TORPACHEV, Coiled Tubing Times more |
 |
Fidmash Marks Its Tenth Anniversary Olga LIS, Coiled Tubing Times more |
 |
The Coiled Tubing Times Questionnairemore |
|