/
Journal
 
Archive
Editorial Board
Subscription
Authors’ Guidelines

Issue 39, March 2012
 
Issue 39, March 2012

Issue 37, September 2011

Key to Success of Innovation Projects
Interview with L. Hruzdzilovich, Chairman of the Board of FID Group, author of Coiled Tubing Times Project
more
Experience of CT Drilling of Multilaterial Wells on the Fields of RUE "Production Association Belorusneft"
N.A. DEMIANENKO, Yu.A. BUTOV, A.N. BOGATKO, P.V. REVIAKOV, RUE “Production Association “Belorusneft” S.A. ATRUSHKEVICH, N.N. KLUBNIKOV, A.G. SALOV, CJSC “Novinka” (FID Group)
more
Will Russian O&G Service Be Integrated?
V.V. Laptev , Vice President of the EurAsian Geophysical Society
more
World’s First Production Logging with Fiber Optic Enabled Coiled Tubing (CT)
Vidal NOYA, Abdur Rahman ADIL, Kellen WOLF, Soon Seong CHEE, John STUKER, Fernando RODRIGUEZ, SPE, Schlumberger
more
ISOJET Technology of Sand Jet Perforation of the Production String With the Use of Coiled Tubing Followed by Hydraulic Fracturing
Stanislav ZAGRANICHNY, Yevgeniy KAZAKOV, Alexander KAZAKOV, Trican Well Service Ltd
more
Coiled Tube Is Able to Transmit Highly-Viscous Plugging Fluid and Magnetic Substances for Water Shutoff in Oil Wells
(based on work experience at oil and gas fields of Turkmenistan) I.B. BURKINSKY, Ph.D. in Economics, Master of Oil and Gas Production, Yu.A. BALAKIROV, Doctor of Engineering, Academician, Professor, V.N. BROVCHUK, Mining Engineer for Oil and Gas Production, Ya.M. BOYKO, Mining Engineer for Oil and Gas Production, Yug-Neftegaz
more
Issues of Sand Production Prevention and Removal of Sand Plugs in the Watering Îut Gas Wells
M.V. LISTAK, Tyumen State Oil and Gas University
more
Price and Quality
The representatives of the oil and gas producing companies are participating in the round table discussion: D.A. Molodan, Deputy Chief of Well Construction and Well Workover Directorate (Gazprom Dobycha Krasnodar), A.N. Rzaliyev, Workover Engineer (Zhaikmunai), P.I. Litvinenko, Senior Well Servicing and Workover Technology Manager (Orenburgneft)
more
BHA Availability is the Main Condition for CTD
Joel Park, Coiled Tubing Drilling Technical Sales, NOV is answering the questions
more
We Use Only Premium Class Packer/Anchor Equipment
A.M. OVSYANKIN, General Director, Packer Service
more
Protection of Îil Field Equipment by Scale Inhibitors Manufactured by FLEK
A.V. DENISOVA, Doctor of Chemistry, Senior Engineer, Technical Department, FLEK
more
The Quality of Propping Materials Determines the Profitability of Hydraulic Fracturing
Yu.A. Balakirov, Doctor of Engineering, Deputy Director for Science and Technology of the International Company Yug-Neftegaz Private Limited
more
Coal Bed Methane
Victoria GREK, Ivan SIDOROV, Coiled Tubing Times
more
Modernization Is a Trend
11th Moscow International Oil and Gas Exhibition 2011/MIOGE 2011
more
Oilfield Chemistry – 2011
6th All-Russian Research and Practice Conference in the I.M. Gubkin Russian State University of Oil and Gas
more
New Equipment and Technologies for Geophysical Well Logging
17th Scientific and Practical Conference in Ufa
more
Oil & Gas Crude Refining and Petrochemistry of the Caspian Sea
18th International Conference in Baku
more
Coiled Tubing Technologies in Ukraine
Sergey TORPACHEV, Coiled Tubing Times
more
Fidmash Marks Its Tenth Anniversary
Olga LIS, Coiled Tubing Times
more
The Coiled Tubing Times Questionnaire
more
Home News Technologies Journal Forum Conference Advertisement Contacts