![]() |
![]() |
| Home | News | Technologies | Journal | Forum | Conference | Advertisement | Contacts | русский | / | english |
|
|
Aker Solutions has been awarded a contract by Daewoo Shipbuilding & Marine
Engineering for the delivery of a deepwater drilling riser system to the DSME
shipyard in South Korea. The riser package will be installed on Atwood Oceanics,
Inc.'s ultra-deepwater drillship, the Atwood Advantage. The contract value is
approximately $48 million.
The 10,000 ft deepwater drilling riser system will be manufactured and delivered
out of Aker Solutions' manufacturing plant in Port Klang, Malaysia. Delivery of
the drilling riser system is scheduled for March 2014.
The delivery is related to the first of two options included in the drilling
riser contract announced in July 2011.
"We are very pleased to see our customers DMSE and Atwood exercising their option
for the Aker Solutions CLIP riser systems," says Thor Arne Håverstad, executive
vice president of Aker Solutions' drilling technologies business.
Aker Solutions has delivered 16 drilling riser systems in the past 16 months,
with positive feedback from operations.
"I am proud to see that we are able to deliver another deepwater CLIP riser to
our returning customers. These achievements are the results of the CLIP risers'
operational advantages, our technology expertise and service offering in the deepwater
drilling market," says Tom Munkejord, president of Aker Solutions' drilling riser
business.
Aker Solutions offers complete drilling equipment packages, including project
management, conceptual design, detailed engineering and procurement. Aker Solutions
provides the full range of topside drilling equipment and systems, and worldwide
customer support through a global drilling lifecycle services organisation.
The contract has been signed and booked as order intake in Q4 2011.
CommentsFor posting your message please login or register |
|
| Home | News | Technologies | Journal | Forum | Conference | Advertisement | Contacts |
| All rights reserved Material from the site can be used with author's agreement only |
Galleria Tower 1 2700 Post Oak Boulevard, Suite 1400 |
Houston Texas 77056 USA Телефон:+1 281 657 3300 E-mail: cttimes@cttimes.org |
Разработка сайта: Веб-студия Александра Ретюхина |