technology

Gazprom Neft to launch a well-construction Drilling Control Centre (DCC) in the Yamalo-Nenets Autonomous Okrug

Gazprom Neft is to launch a Drilling Control Centre (DCC) in Muravlenko, creating a common organisational and digital space that will facilitate a 15% reduction in well-construction lead times at Gazpromneft-Noyabrskneftegaz fields in the Yamalo-Nenets Autonomous Okrug. Read more

technology

Coiled Tubing Has Set New Benchmarks for Multistage Fracturing in Poorly Consolidated Terrigenous Reservoirs

Today, when most reservoirs have low productivity, the question of whether multistage hydraulic fracturing can be applied in wells with complex geology becomes very important. An outstanding example of multistage hydraulic fracturing using coiled tubing was a project in Messoyakha oil, gas and condensate field where multistage fracturing was successfully performed for stimulation of production of hard-to-recover heavy oil in poorly consolidated reservoirs at shallow depths and low temperature. Read more