Company news
-
09.08.2016
The delegation of PJSC Ukrgasdobycha visited Belorusneft
The Ukrainian experts have visited scientific laboratory complex of BelNIPIneft Institute and seen the capabilities of Belorusneft subdivisions. More»
- Comments:
- (0)
-
08.08.2016
LUKOIL Continues Facility Construction for the Second Stage of Filanovsky Field Development in the Caspian Sea
LUKOIL commenced transportation of jackets for the offshore ice-resistant stationary platform #2 from the port of Astrakhan to the Filanovsky field in the Caspian Sea. More»
- Comments:
- (0)
-
03.08.2016
Belarusian oilmen are ready to provide oilfield services to Ukrnafta
Belorusneft could offer workover operations, seismic acquisition and high-tech engineering from the Institute BelNIPIneft. More»
- Comments:
- (0)
-
02.08.2016
Total and Zarubezhneft Сlose the Deal to Transfer a 20% Participating Interest and Kharyaga PSA Operatorship
Total E&P Russie has transferred a 20% participating interest in and the operatorship for the Development and Production of Oil in the Kharyaga Field to Zarubezhneft-Production Kharyaga LLC, a subsidiary of Zarubezhneft JSC. More»
- Comments:
- (0)
-
01.08.2016
Rosneft and PDVSA Expand Strategic Cooperation
Rosneft and Petróleos de Venezuela, S.A. (PDVSA) in the presence of the country president Nicolas Maduro signed a number of documents aimed at further development of strategic cooperation between the companies. More»
- Comments:
- (0)
-
29.07.2016
SPD Drilled Champion Well at Upper Salym
Salym Petroleum Development (SPD) drilled a 3305-meters-deep well at Upper Salym in less than 8 days. More»
- Comments:
- (0)
-
27.07.2016
Bashneft and the Skolkovo Foundation sign a Strategic Cooperation Agreement
The aim of the Agreement is to promote research and technical cooperation in the development and implementation of innovative and competitive Russian equipment and technologies. More»
- Comments:
- (0)
-
26.07.2016
10th production well commissioned at Gazprom Neft Badra field, Iraq
Gazprom Neft Badra, a subsidiary of Gazprom Neft, has commissioned its 10th production well (P-07) at the Badra field, Iraq. More»
- Comments:
- (0)
-
21.07.2016
Plugging department specialists of Belorusneft company carried out works for the Russian company
Belarusians have successfully conducted 20 well operations on hydraulic fracturing for RN Krasnodarneftegaz. More»
- Comments:
- (0)
-
19.07.2016
Weatherford Deep-Set Safety Valve Achieves V1 Rating
Weatherford International plc announced that its new model WUDP-10 deep-set safety valve has been certified to V1 standards under the American Petroleum Institute (API) Specification 14A. More»
- Comments:
- (0)