Company news
-
22.03.2016
Weatherford Wins Plug and Abandonment Award
Weatherford was named P&A Pioneer at the DecomWorld Awards 2016, held on February 23 during the DecomWorld Decommissioning and Abandonment Summit in Houston, Texas. More»
- Comments:
- (0)
-
21.03.2016
Oil production at Gazprom Neft’s Prirazlomnoye field to increase almost two-fold
A revised production schedule for Gazprom Neft’s Prirazlomnoye field, recently approved by Russia’s Federal Subsoil Resources Management Agency (Rosnedra), has seen the field’s “peak” production period increased from three years to five. More»
- Comments:
- (0)
-
17.03.2016
Equipment by RIMERA GROUP’s Almetyevsk Plant Has Worked Away 5 Years in Tomskneft Well
Alnas plant (part of Rimera Group) has successfully completed the field trial of a high-capacity ESP at Sovetskoye Field. The time between failures was 1,886 days, which 3.5 times as long as the maximum time for previous units. More»
- Comments:
- (0)
-
15.03.2016
Rosneft and Petrovietnam Leaders Visit Rosneft Operated Exploration Drilling Rig
Rosneft Chairman of the Management Board Igor Sechin and Petrovietnam’s President & CEO Nguyen Vu Truong Son made a visit to Rosneft operated Lan Tay production platform and exploration drilling rig in Block 06.1 offshore Vietnam. More»
- Comments:
- (0)
-
11.03.2016
Jointly Developed LWD Service Wins SPE Award
Weatherford, Chevron Recognized for High-Temperature Technology. More»
- Comments:
- (0)
-
10.03.2016
Belorusneft to start drilling oil wells in Ecuador in 2016
The company Service Oil Ecuador Ecuaservoil S.A., which is a subsidiary of the Belarusian industrial group Belorusneft, has plans to start drilling oil wells in Ecuador in 2016. More»
- Comments:
- (0)
-
09.03.2016
Rosneft Commences Exploratory Drilling Offshore Vietnam as a Project Operator
Rosneft Vietnam B.V., a company of Rosneft group, has started drilling exploration well PLDD-1X at Block 06.1 located offshore Vietnam. More»
- Comments:
- (0)
-
02.03.2016
SPD Set a New Record of Daily Well Drilling
Salym Petroleum Development (SPD) set a new record of daily well drilling of 1,204 meters. It was achieved drilling the well at West Salym field from below long conductor shoe. More»
- Comments:
- (0)
-
01.03.2016
Quality Tubing has expanded its Service Center Network
From the design and manufacturing process to servicing your coiled tubing, we take pride in serving as your partner. More»
- Comments:
- (0)
-
23.02.2016
Gazprom and Bolivia advancing cooperation to new levels
The Agreement stipulates the collaboration in the exploration, production and transportation of hydrocarbons, construction and upgrading of oil and gas infrastructure, as well as building of power generation capacities in Bolivia. More»
- Comments:
- (0)