- Home page /
- News
News
-
22.08.2012
Statoil awards Baker Hughes with integrated drilling services contract for 25 NCS fields
Statoil has been awarded Baker Hughes with an agreement to provide integrated drilling services for 25 fields on the Norwegian continental shelf (NCS). More»
- Comments:
- (0)
-
21.08.2012
TNK-ВР Investing $800 Million in 2012 to Develop Uvat Greenfields in West Siberia
TNK-ВР is expected to invest as much as $800 into its Uvat upstream projects in 2012 to support deployment of innovative production technologies, develop related infrastructure and continue exploration. More»
- Comments:
- (0)
-
17.08.2012
Varel And NewTech Services Launch Russia's Most Advanced PDC Drill Bit Manufacturing Plant
Varel International and NewTech Services announce building completion and launch of their polycrystalline diamond (PDC) drill bit manufacturing plant located in Kurgan, Russia. Using the most advanced global technologies and tools this plant will be... More»
- Comments:
- (0)
-
17.08.2012
Video-interview with Shell Russia Country Chairman (ROG-2012)
Video-interview with Harry Brekelmans, Shell Russia Country Chairman, who speaks about The Russian Oil and Gas Exploration and Production Technical Conference and Exhibition, which will be held on October 16-18, 2012 in Moscow. More»
- Comments:
- (0)
-
16.08.2012
TNK-BP to Invest Over $60 Million Into West Siberia Water Shutoff Program by 2014
ТNК-ВР will invest over $60 million to implement a 3-year water shutoff technology program, which is expected to cut the cost of producing ‘challenged’ oil reserves in West Siberia. More»
- Comments:
- (0)
-
15.08.2012
Halliburton Enters New Market With Acquisition of Old School Services LLC
Boots & Coots, a Halliburton business line, has enhanced its pressure control offerings with the acquisition of Old School Services LLC. The acquisition gives Halliburton the resources to provide operators with the through-tubing equipment required... More»
- Comments:
- (0)
-
10.08.2012
STEP Takes Possession Of Second Coiled Tubing Mast Unit
Currently, both of STEP’s purpose-built coiled tubing mast units are operating in the field with 4,500 metres of 73 millimetre and 5,200 metres of 66.7 millimetre of coiled tubing, respectively. More»
- Comments:
- (0)
-
08.08.2012
TATNEFT Expands Hydraulic Fracturing Method Application
At OAO TATNEFT one of the most effective ways to significantly increase oil recovery rate and cost-effectively operate wells at the late stage of development is the technology of formation hydraulic fracturing (HF). The Company’s specialists have... More»
- Comments:
- (0)
-
03.08.2012
GE Acquires PRESENS, Norway-Based Supplier Of Industrial Sensors
GE has announced the acquisition of PRESENS, a provider of pressure, temperature and flow measurement solutions. The acquisition expands GE’s portfolio of sensing solutions and will be part of the company’s Measurement & Control business within... More»
- Comments:
- (0)
-
30.07.2012
Schlumberger is at the forefront of seismic services
With industry-leading technology and novel acquisition techniques, Schlumberger is at the forefront of seismic services. But this leadership is further differentiated by being the only oilfield services company that includes seismic services as an... More»
- Comments:
- (0)