- Home page /
- News
News
-
08.05.2014
Moscow prepares for Arctic drilling
In a series of tenders, the Russian government places almost 900 million roubles in Arctic offshore development projects. More»
- Comments:
- (0)
-
06.05.2014
New Partner of Belorusneft
The equipment for hydraulic and acid fracturing is on its way to the Chechen Republic. More»
- Comments:
- (0)
-
02.05.2014
Russia’s Gazprom Neft finds shale oil at Krasnoleninskoye deposit
Shale oil flow at 50 cubic meters per day has been detected after hydraulic fracturing at a new well drilled at the Palyanovskaya block of the Krasnoleninskoye deposit of Gazpromneft Khantos. More»
- Comments:
- (0)
-
28.04.2014
Izhevsk Plant of Rimera Group Looks to Increase Productivity of Sucker Rod Pump Production by 20%
Izhneftemash plant, part of Rimera Group, has commenced yet another phase of the Target production system in the subsurface sucker rod pump production shop. More»
- Comments:
- (0)
-
28.04.2014
Baker Hughes plans to disclose all fracturing chemicals
Baker Hughes plans to disclose all of the chemicals used in its hydraulic fracturing fluids. More»
- Comments:
- (0)
-
23.04.2014
First oil from Russian Arctic shelf loaded
Gazprom loaded the first cargo of oil produced from the Prirazlomnoye field, the only Russian project for hydrocarbons development in the Arctic shelf. More»
- Comments:
- (0)
-
21.04.2014
20th anniversary of Sakhalin Energy
Sakhalin Energy Investment Company Ltd. (Sakhalin Energy), the operator of the Sakhalin-2 project, celebrates its 20th anniversary. Sakhalin Energy has been established in 1994 to operate one of the largest oil and gas industry projects –... More»
- Comments:
- (0)
-
17.04.2014
Rimera to Showcase New Solutions at Moscow Conference
On April 15-17, Moscow is hosting the 11th International Conference and Exhibition – Mechanized Production 2014. This year, the Rimera team will unveil two new solutions at the conference. More»
- Comments:
- (0)
-
11.04.2014
Gazprom Neft selects contractor to lay pipeline in Iraq
Gazprom Neft, operator of the Badra oilfield development project, has appointed a contractor to lay the pipeline connecting the field to the power station in Zubaidiah (Wasit Province). More»
- Comments:
- (0)
-
09.04.2014
First oil from Prirazlomnaya offshore oil production platform
Gazprom Neft plans to get the first shipload of oil from its controversial Arctic project in late April. More»
- Comments:
- (0)