- Home page /
- New technologies and equipment
New technologies and equipment
-
09.04.2019
Oil production at Kashagan to be suspended for 45 days
Courtesy of angi.ru Oil production at Kashagan deposit will be suspended for a 45-day period, Kazinform correspondent reports. According to the North Caspian Operating... More»
- Comments:
- (0)
-
03.04.2019
Gazprom Neft and IBM Research Brazil are using AI to improve quality in processing geological information
Courtesy of gazprom-neft.com Research Cooperation Agreement on the use of machine learning systems and artificial intelligence (AI) aims to optimise the analysis and... More»
- Comments:
- (0)
-
01.04.2019
Autonomous Power Generation Centre Set at North-Komsomolskoye Field
An autonomous power generation centre has been created at North-Komsomolskoye field to ensure failure-free power supply to drilling units and processing facilities. The centre comprises mobile smart gas-turbine units with a capacity of 2,500 kW each. More»
- Comments:
- (0)
-
29.03.2019
Geophysics of “Belorusneft” mastered advanced technology research in wells
Specialists of the Well Logging Department mastered the advanced technology of research in horizontal and subhorizontal wells. More»
- Comments:
- (0)
-
18.03.2019
Belorusneft develops and introduces new drilling mud
Courtesy of belorusneft.by Belorusneft’s drillers began commercially using new drilling mud. The solution was developed by BelNIPIneft experts. This was provided for by a... More»
- Comments:
- (0)
-
13.03.2019
The АРС-200 mobile drilling rig was put on rails in Belorusneft-Siberia
Courtesy of belorusneft.by The unit with a lifting capacity of 200 tons and with the ability to build wells with a depth of up to 4 thousand meters produced by Seismotekhnika OJSC... More»
- Comments:
- (0)
-
12.03.2019
Tyumenneftegaz achieved a 30% increase in downhole splitter drilling at Russkoe field
Courtesy of rosneft.com Tyumenneftegaz, a Subsidiary of Rosneft, drilled 15 downhole splitters at Russkoe field in 2018, which is 30% more year-on-year. All the drilled horizontal... More»
- Comments:
- (0)
-
21.02.2019
Rosgeo: the exploration of inter-salt hydrocarbon deposit potential is very high in Russia
"Salt-dome areas should be purposefully studied in Russia in order to conduct the prospecting and exploration of inter-salt hydrocarbon deposits," said Victor Groshev, the candidate of geological and mineralogical sciences, the expert of the Seismic... More»
- Comments:
- (0)
-
20.02.2019
World's biggest battery to boost solar for Texas oil country
The world’s largest battery could soon be storing solar energy deep in the heart of Texas oil country. More»
- Comments:
- (0)
-
13.02.2019
Record Fishbone Built at East-Messoyakha field
A unique for the industry multilateral well with eight branch holes by the fishbone* technology was built at East-Messoyakha field. The length of the productive hole is 5.1 km, the total drilling rate is 9.1 km. The oil-saturated layer in the... More»
- Comments:
- (0)