- Home page /
- New technologies and equipment
New technologies and equipment
-
03.09.2014
Baker Hughes Introduces ESP System for Deviated and Horizontal Wells
Baker Hughes announced the commercial release of the FLEXlift Curve™ tight-radius system, an electrical submersible pumping (ESP) system designed to pass through the bend section in deviated and horizontal wells. More»
- Comments:
- (3)
-
29.08.2014
MicroSeismic Announces FracRx Stage-By-Stage Completions Optimization
MicroSeismic, Inc. has announced the release of its latest technology, FracRx, a proprietary service which allows operators to increase asset values by optimizing the treatment of each well. More»
- Comments:
- (0)
-
28.08.2014
New bit provides better curve drilling performance and improved rig economics
Baker Hughes announced the commercial release of its Kymera™ FSR directional hybrid drill bit, which delivers fast, smooth, and reliable performance while drilling curve sections in challenging carbonate formations. More»
- Comments:
- (0)
-
27.08.2014
Baker Hughes introduces fracture analysis services to increase production and ultimate recovery
Baker Hughes has announced the commercial release of its StageWatch fracture analysis services that include monitoring sleeves and retrievable pressure/temperature (P/T) gauges to collect P/T data. More»
- Comments:
- (0)
-
26.08.2014
Halliburton Introduces CoreVault™ System
Halliburton's Wireline & Perforating business line introduced the CoreVault™ system, a unique solution that provides a more accurate volumetric picture of the amount of oil and gas trapped in unconventional reservoir rocks. More»
- Comments:
- (0)
-
22.08.2014
New Technologies of TatNIPIneft
TATNEFT Company is successfully implementing the technology developed by TatNIPIneft to reduce water influx in carbonate reservoirs through application of swellable elastomers. More»
- Comments:
- (0)
-
18.08.2014
New Daily Drilling Performance Record
Salym Petroleum Development (SPD) set a new daily rate of penetration (ROP) record of 1,381 meters (4,530 ft). More»
- Comments:
- (0)
-
06.08.2014
New Alnas Equipment Passes Quality Test in Belkamneft Well
Alnas, the Almetyevsk-based plant of Rimera Group, has successfully completed pilot testing of its new pump unit in a well of the Yuskinskoye Field developed by Belkamneft. The new equipment continues to run without incident to reach an ever higher... More»
- Comments:
- (0)
-
05.08.2014
SPD Pioneered Radial Drilling
SPD has successfully completed the first radial drilling operations in the history of the Salym project. More»
- Comments:
- (0)
-
01.08.2014
White Well Delivers First Results
Equipment supplied as part of ChelPipe Group's White Well project continues to operate without incidents in difficult wells of Tomskneft. More»
- Comments:
- (0)