Record Oil Flow Rate Well Completed at the Yarudeyskoye field

27.09.2019
Courtesy of teknoblog.ru

PAO NOVATEK announced today, that Yargeo, NOVATEK joint venture, successfully completed well number 68 targeting the Jurassic layers at the Yarudeyskoye field, utilizing a horizontal length of 1,068 meters as part of the well construction design.

Initial daily well flow rate amounted to 1,010 tons, representing the field’s best well flow rates since commissioning of the field in 2015. The flow rate was achieved without hydro-fracturing due to the well’s unique design, and is part of a program to maintain the field’s oil production.

Source: novatek.ru

Scroll up