Conception of the Bovanenkovskoe field development provides construction of new highly reliable and intelligent wells. Well completion is a set of operations that finish its construction. Well completion includes well casing, secondary formation exposing, production tubing pulldown and well development.
According to the accepted field development scheme, upon completion of well casing it is planned to run downhole equipment complexes in the hole, temporarily abandon the well, then re-enter it, develop and bring it on line.
According to the field development conception all the drilled gas wells will be equipped with production tubing and downhole equipment complex. The drill crew and the well workover crew will take part in the operation of well rigging with downhole equipment complexes.
.....
Full version of the article can be downloaded here.
-
24.12.2021
Gazprom Neft, Skoltech and the Khanty-Mansi autonomous okrug-Yugra are developing technologies to produce hard-to-recover oil
-
17.12.2021
Gazprom neft establishes Russia’s first test facilities for developing hard-to-recover oil production technologies
-
25.11.2021
LUKOIL successfully tries out casing drilling
-
08.11.2021
Gazprom Neft and Gazprom Burenie to support the development of Russia’s first oil- and gas-well drilling robot