- Home page /
- Technologies /
- Our publications about technologies /
- Multi-stage hydraulic fracturing using coiled tubing and...
Multi-stage hydraulic fracturing using coiled tubing and TriFrac-C™ fluid system
For the last few years progress in the area of hydraulic fracturing in horizontal sections of the well has dramatically stepped forward and Trican Well Service contributed significantly to the development and improvement of these technologies. Special attention should be paid to multi-stage and selective fraccing techniques which allow performing treatment in extended horizontal sections of the well.
Trican Well Service applies disciplined scientific approach to research, development, innovative products and technological processes and takes due account of safety measures, quality and minimization of adverse environmental impact of its products. The company’s customers are supplied with techniques and processes aimed not only at efficiency, effectiveness and considerable saving but first of all at labor protection, safety measures and environmental protection. Trican Well Service’s mission is to deliver a integrated technical solution for well completion, cementing, hydraulic fracturing to coiled tubing.
In the beginning of the last year the range of well completion systems was expanded due to the acquisition of a Norwegian company specializing in completion equipment and downhole interventions and to date Trican managed to create a comprehensive package of field-tested completion systems. At present, being one of the largest providers of downhole interventions Trican offers a wide range of techniques for multi-stage completion of horizontal holes using hydraulic fracturing. The completion service is composed of highly qualified and experienced specialists working on most advanced developments which makes it possible, unlike the competitors who offer universal techniques, to supply customized technical solutions meeting specific customer’s requirements.
.....
Full version of the article can be downloaded here.
-
24.12.2021
Gazprom Neft, Skoltech and the Khanty-Mansi autonomous okrug-Yugra are developing technologies to produce hard-to-recover oil
-
17.12.2021
Gazprom neft establishes Russia’s first test facilities for developing hard-to-recover oil production technologies
-
25.11.2021
LUKOIL successfully tries out casing drilling
-
08.11.2021
Gazprom Neft and Gazprom Burenie to support the development of Russia’s first oil- and gas-well drilling robot