- Home page /
- Technologies /
- Oilfield practice /
- Our Equipment Is Not Idle, We Always Find the Right Amount...
Our Equipment Is Not Idle, We Always Find the Right Amount of Work
A. Novichkov, Deputy General Director for Production – Director of the Krasnoyarsk branch of "BVT-Vostok" is responding the questions of Coiled Tubing Times Journal.
Mr. Novichkov was born in 1970 in the town of Leninogorsk, Tatarstan. He graduated from Tomsk Polytechnic University with a degree in Geology and Exploration of Oil and Gas Fields. He also graduated from Yugra State University with a degree in Economy and Management at the Companies for the Use of Natural Resources.
Mr. Novichkov has been working in oil and gas sector since 1996.
1996–2000 – JV Yugraneft Corporation, Well Surveying Operator, Foreman of Well Surveying Team, Geologist.
2000–2002 — OJSC Slavneft-Megionneftegaz, Senior Geologist of EOR Department.
2002–2004 – OJSC Yugraneft Corporation(the company became a part of TNK-BP), Deputy Chief of Geologocal Service (Deputy Chief Geologist).
2004–2011 – LLC Newco Well Service (Trican well Service), consequentially worked in the following positions: Deputy Chief of Geological Service, Deputy Chief for Production of Nefteyugansk site, Chief of Vankor site.
Since 2011 has been working as a Director of Krasnoyarsk branch of BVT-Vostok that has its main operations at Vankor field.
.....
Full version of the article can be downloaded here.
-
24.12.2021
Gazprom Neft, Skoltech and the Khanty-Mansi autonomous okrug-Yugra are developing technologies to produce hard-to-recover oil
-
17.12.2021
Gazprom neft establishes Russia’s first test facilities for developing hard-to-recover oil production technologies
-
25.11.2021
LUKOIL successfully tries out casing drilling
-
08.11.2021
Gazprom Neft and Gazprom Burenie to support the development of Russia’s first oil- and gas-well drilling robot