Coiled Tubing Reduces Stimulation Cycle Time by More Than 50% in Multilayer Wells in Russia
Traditionally, coiled tubing (CT) in Russia has had very limited service diversity. Its use has been concentrated at wellbore cleanouts and nitrogen kickoffs after fracturing treatments.
We used coiled tubing equipment and technologies to supplement stimulation operations in one of the world’s largest oil fields, Priobskoe, which has up to five separate layers per well. Conventionally, well completions here have involved complicated workover operations with tubing, packers, and wireline perforating after each stimulated layer.
Average wells with three layers took 30 days to complete. CT provided a significant improvement in completion efficiency, reducing the cycle time to just 10 to 12 days.
.....
Full version of the article can be downloaded here.
-
24.12.2021
Gazprom Neft, Skoltech and the Khanty-Mansi autonomous okrug-Yugra are developing technologies to produce hard-to-recover oil
-
17.12.2021
Gazprom neft establishes Russia’s first test facilities for developing hard-to-recover oil production technologies
-
25.11.2021
LUKOIL successfully tries out casing drilling
-
08.11.2021
Gazprom Neft and Gazprom Burenie to support the development of Russia’s first oil- and gas-well drilling robot